To comment on any of these projects, Please send comments to Planning@dryden.ny.us
______________________________________________________________________________________________________________________________________
1279 Dryden Road – Multi-family dwellings
- 1279 Dryden RD Application
- 1279 Dryden RD site plan
- 1279 Dryden RD SUP worksheet
- 1279 Dryden Road -Ground disturbance form
- photo of example building
- 1269-1279 Dryden Road survey map
- 1279 Dryden RD building plans
- 1279 Dryden RD SEAF Part 1
1622A Dryden Rd – First Light Fiber Shelter
- 1622 Dryden Ave Special Permit GML Review
- draft Site Plan and SUP Approval -1622 Dryden Rd utility shelter
- 1622 Dryden Road-First Light PD Memo
- NY-003 Dryden_First Light_X-SpecialUse Permit Worksheet_1.1.2021 S
- NY-003 DRYDEN_Rev3_12.31.20 (with survey)
- NY-007 01simA
- NY-007 01simB
- NY-007 02simB
- 1622DrydenRoadNY-003 Dryden_ App -signedcopy
- PB recomendations 7-23-20
- 1st light NOH
- Short EAF- 6.1.2020 S
219 Ellis Hollow Creek Rd – Dominion’s Borger Station
SUP to replace 2 turbines
- PUBLIC_Borger Compressor Station Advance Notification
- Borger Replacement EA_20210216-3003_CP21-40-000
- CO2e Methane Capture email 9-16-2020
- draft resolution Site Plan and SUP Approval -219 Ellis Hollow Creek RD -Borger turbine replacement project
- Borger Station Ren 3 Proposed Air_9.2.20_
- Letter Attachments
- Dryden SUP Public Comment Letter 09012020
- 219 Ellis Hollow Creek Road Turbine Replacement SUP GML Review 08-26-20
- draft Resolution Declaring Lead Agency re Borger Turbine Replacement Project
- Dominion Response to Comments 2020.08.18
Revisions September 2020
- NY_NPDES_SWPPP_Borger Replacement_Aug 2020_Rev 1
- Appendix C _Site Development Plan_03 Sep 2020
- 2020.09.15 Revised Site Plans and SWPPP to Town
Public Comments:
- Dryden Safety and Preparedness Advisory Committee 9-17-2020
- 8-20-2020
- Aug 19-20 – 2020
- Aug 17-19-2020
- Aug 14-17-2020
- Aug 14-2020
- Aug 13 2020 part 2
- Aug 11-13-2020
- Quinn-Jacobs, Katie Aug. 14, 2020
- 2020.07.30 Borger Replacement Project – Response to Questions
- Page 6 Potential Borger Replacement Project
Revisions to application – August 2020
- NOH 219 Ellis Hollow Creek Road-Borger Station
- PD memo -Dominion Borger turbine replacement project
- Borger Replacement Response to Town of Dryden 2020.08.10
- 1 – Site Development Plans
- 2 – SWPPP
Original application
- 2020.07.30 Borger Replacement Project – Response to Questions
- Attachment 1 – Dryden General Permit Application & Site Plan Checklist
- Attachment 2 – Site Development Plans
- Attachment 3 – Limit of Disturbance Figures
- Attachment 4 – Architectural Drawings
- Attachment 5 – Lighting Package
- Attachment 6 – Landscaping Plan
- Attachment 7 – Visual Renderings reduced
- Attachment 8 – SWPPP reduced
- Attachment 9 – Part 1 Full EAF
- Attachment 10 – Noise Study
- Dryden SUP Cover Letter-06-10-2020 – signed
983 Peruville Road – Fingerlakes Shaolin
- 983 Peruville Road -PD memo
- 983 Peruville -Fingerlakes Shaolin plans
- 983 Peruville -SUP application
- 983 Peruville SUP Worksheet
- 983 Peruville survey
- NOH 983 Peruville Rd – martial arts school
- 983 Peruville -parking, sign, planting plan
- 983 Peruville SEAF part 1
- 983 Peruville Road SUP GML Review 03-04-20
959 Dryden Road – Trinitas Townhomes in Varna
Application Revision December 2019
- L2.0_Improvement Site plan-SEQR Improvement_12192019
- L4.0 – SITE GRADING PLAN-SEQR Submission_12192019
- 00_Trinitas Cover Letter – Town of Dryden Resubmission 12.19.19
- 0_Errata Sheet – Trinitas – 2019-12-19
- 0_Revision Narrative 2019-12-19
- Long Form – Full Environmental Assessment Form Part 1
- Appendix W_Zoning Tabs
- Appendix W_Green Space Tabs
- Appendix W_Density Tabs
Supplement materials November 2019
- 01_SEQR Long Form – Full Environmental Assessment Form Part 1_print 11-12-19
- L2.0_Improvement Site plan 11-12-19
- L4.0_SITE GRADING PLAN 11-12-19
- Errata Sheet – Trinitas 11-12-19
- lt191017 – Response to TG Miller 11-12-19
- z Zoning Tabs_111119 11-12-19
- Appendix B full SWPPP report_October-2019 11-12-19
- 00_Cover Letter 10-17-19
- 01_Site Plan Review Permit App – Trinitas
- 02_Site Plan Review Checklist
- 03_SUP Application Form
- 04_Notice of Ground Disturbance
- 05_L8.0_Code compliance – truck movement
- 06_L8.1_Code compliance – sight distance
- 07_Photometric Plan
- 08_TrinitasVarna_EntrySign_20181024
- 09_NYSDEC Endangered Species Letter
- IAWWTF declaration of available capacity
- GML 239 Review for Sept. application of Proposed Townhomes at 959 Dryden Road
- Appendix A1 Updated Water Sewer Commitment Letter – Trinitas 9.23.19
Application submitted 9-12-19
- 00_Submission List
- 02_180718-TG Miller COMMENT Letter
- 02a_180813-HUNT Response to 180718 TG Miller Letter
- 03_180927-Town Sketch Plan COMMENTS
- 03a_181025_HUNT Response to Town Sketch Plan Letter from 180927
- 04_181206-PB draft meeting minutes-COMMENTS
- 04a_190123-HUNT Reponse to PB Minutes from 181206
- 05_181218-TG Miller COMMENT Letter
- 05a_190121-HUNT Response to 181218 TG Miller Letter
- Appendix A – Domestic Water and Sewer Computations
- Appendix C – Traffic Impact Study (TIS)
- Appendix C1 – TIS Memo Rendering Opinion – 01-30-19
- Appendix C2 – TIS Response Letter to TG Miller Comments
- Appendix D – NYSDOT Conceptual Approval of TIS
- Appendix E – NYSEG Will Serve Letter
- Appendix F – NYSDEC Spills Database
- Appendix G – Geotech Report
- Appendix H – NYSDEC Env-Mapper
- Appendix I – US Fish and Wildlife Endangered Species – NLEB
- Appendix J – TES Letter on NLEB
- Appendix K – NYSDEC Sedge Wren Letter
- Appendix L – Agricultural Soils Spreadsheet
- Appendix M – SHPO Letter
- Appendix N – Viewshed Letter
- Appendix O – Architectural Renderings of the Site
- Appendix P – Letter on Confromance to Varna Plan
- Appendix Q – Garage Profiles
- Appendix R – Typical Floor Plans
- Appendix S – Concept Sign Plans
- Appendix T – Wetland Delineation Report
- Appendix T1 – Preliminary ACOE Wetland JD
- Appendix U – County Energy Responses Village at Varna
- Appendix V – Environmental Phase 1 Site Assessment
- L0.0_Existing Conditions plan
- L3.0 SITE UTILITY PLAN
- L5.0_SITE LANDSCAPE PLAN-FOR SUP
Application January 2019
- Trinitas – County Energy Responses – Village at Varna
- 01_Response to PB Minutes from 2018-12-06
- 02_ Response to TG Miller
- 03_Full Environmental Assessment Form Part 1 -1-28-19
- 04_Water and Wastewater Demand Calculations
- 05_L0.0_Existing Conditions plan
- 06_L2.0_Improvement Site plan
- 07_L3.0 SITE UTILITY PLAN
- 08_L4.0 – SITE GRADING PLAN
- 09_Architectural Renderings of the Site
- 10_Phase I Environmental Site Assessment
- Binder OF DOCS 1-9 updated 1-28-19
- Comments 12-18-18 to 5-31-19
- Trinitas Completeness Review 2018-12-17
- Comments 11-17-18 to 12-17-18
- DEC response re wildlife
- See town meeting minutes
- Varna townhomes -PD sketch plan memo
- Varna plan 12-20-12
- Varna Design Guidelines & Landscape Standards
- Comments 11-1-18 to 11-16-18
Full Site Plan 10-25-18
- 01_Site Plan Review Permit App – Trinitas
- 02_Site Plan Review Checklist
- 03_Comment Response Letter to Board Letter
- 04_SUP Application Form
- 05_Varna Plan Letter – Trinitas
- 06_Notice of Ground Disturbance
- 07_SEQR LEAF_10242018
- 08_T.G. Miller Comment Response Letter to EAF Comments
- 09_Townhomes at Dryden TIS
- 09a_NYSDOT Conceptual Approval of TIS
- 10_Wetland DelineationReport
- 11_Geotech Report
- 12_Zoning Tabs
- 13_L0.0_Existing Conditions plan
- 14_L2.0_Improvement Site plan
- 15_L3.0 SITE UTILITY PLAN
- 16_L4.0 – SITE GRADING PLAN
- 17_L5.0 SITE LANDSCAPE PLAN
- 18_L8.0_Code compliance – truck movement
- 19_L8.1_Code compliance – sight distance
- 20_Preliminary SWPPP
- 21_Photometric Plan
- 22_TrinitasVarna_EntrySign_20181024
- 23_TrinitasVarna_GarageDwgs_20181024
- 24_TrinitasVarna_FloorPlans_20181024
- 25_TrinitasVarna_Elevs_20181024
- 26_Construction Schedule
Revisions September 2018
- 959 Dryden Road -sketch conditions letter
- Trinitas – Sketch Plan Presentation III 9.20
- TGM – Trinitas Sketch Plan Review 2018-09-20
- Public comments Sept. 1-19
- lt180913 – Letter confirming sewer amount
- Townhomes at Dryden -Traffic Impact Study – FINAL – 09-04-18
- L2.0_Improvement Site plan-L2.0-2018-09-04
- Zoning Tabs-2018-09-07
Revisions August 2018
- Trinitas – Sketch Plan Presentation II 8.16
- Soil Report
- Wetland Delineation Report
- HUNT Response to 180718 TG Miller
- Preliminary Geotechnical Engineering Study
- L2.0_Improvement Site plan-L2.0 -20180810
- Zoning Tabs -20180810
- 0 comments for Aug.
Revisions July 2018
- TGM -Trinitas Sketch Plan Review 2018-07-18
- Trinitas – Planning Board Presentation 7.26
- Trinitas – Sketch Plan Presentation 7.19
- Public comments July 16-25
- Public comments July 1-15
- Zoning Tabulations – 2018-07-06
- L2.0_Improvement Site plan
Revisions June 2018
- Trinitas – Introduction to Board 6.21.18
- Public comments – June
- Executed Full EAF – Trinitas Dryden
- Prelim Permit Form – Trinitas
- Updated Dryden SUP Form
- SEQR SEAF-Project Description
- Updated SEAF – Trinitas
- Zoning Tabs
- Preliminary Engineering Report_5-31-18
- L0.0_Existing Conditions plan
- L2.0_Improvement Site plan
- Notice of Ground Disturbance-Signed
Application 5-21-18
- Special Use Permit Application – Dryden EXECUTED
- Project Narrative
- L0.0_Existing Conditions plan
- L2.0_Improvement Site plan
- Zoning Tabs
- Executed Agency designation (002)
Delaware River Solar, LLC Community Solar Project at 2243 Dryden Road (between Ferguson & Dryden Road & east of Irish Settlement Road)
- survey
- 2243 Dryden Rd. SEQR Part 3-attachment A (Draft 2018-03-12)
- Draft Resolution–SUP Site Plan 2243 Dryden Rd a
- Draft 2243 Dryden Road solar Neg Dec
- TGM 2243 Dryden Rd. SUP Conditions 2018-02-14
- 2243 Dryden Road site plan checklist with PD notes
- 2243 Dryden Road SUP checklist with PD notes
- DEC jurisdictional determination-Delaware River Solar LLC 2243 Dryden Rd
- Dec. 19, 2017 – PB minutes and recommendation on site plan
- Notice of Hearing for DRS SUP application 2-15-18 a
- DRAFT 2243 Dryden Road FEAF Part 2
- DRAFT 2243 Dryden Road FEAF Part 3
- DRAFT 2243 Dryden Rd. SEQR Part 3-attachment A
- 2243 Dryden Road -DRS memo re Fire Access
- TC 239 review -2243 Dryden Road Solar 01-17-18
Complete Application with Revisions through Jan. 29, 2018
- AttA_General-Permit-Application-Form
- AttB_Owner-Acknowledgment-Ltr
- AttC_SUP-Worksheet_01-02-2018 (Revised)
- AttD_Ground-Disturbance-Notice_Revised-2018-01-26
- AttE_Agricultural-Data-Statement
- AttF_Project-Summary_Revised-2018-01-26
- AttG_Decomm-Plan-Agreement [Revised]
- Pages from AttH_Views Study Revised 2018-01-26 a
- Pages from AttH_Views Study Revised 2018-01-26-2 b
- AttI_Wetlands-Findings-Letter
- AttJ_FEAF_2018-01-26
- AttK_SWPPP-complete_2018-01-26
- AttL_Site-Plans_Revised-2018-01-29
- AttM_Topo-Boundary-Survey_KMS_revised-2018-01-29
- AttN_Glare-Assessment_2017-10-10
- AttO_Visual Sims 2018-01-02
- AttP_Lease-Agreement-Redacted
- AttQ_Draft Common-Driveway-Agreement
- AttR_Vegetative-Maintenance-Plan_Revised-2018-01-02
- AttS_SHPO-Findings-Ltr
Complete Application with Revisions through Jan. 3, 2018
- AttA_General-Permit-Application-Form
- AttB_Owner-Acknowledgment-Ltr
- AttC_SUP-Worksheet_01-02-2018 (Revised)
- AttD_Ground-Disturbance-Notice_Revised-2017-12-14
- AttE_Agricultural-Data-Statement
- AttF_Project-Summary_Revised-2018-01-02
- AttG_Decomm-Plan-Agreement [Revised]
- AttH_Views Study Final 1-3-2018 v9
- AttI_Wetlands-Findings-Letter
- AttJ_FEAF_2018-01-02
- AttK_SWPPP-complete_2017-12-14
- AttL_Site-Plan-Set_Revised_2017-12-22
- AttM_Topo-Boundary-Survey_KMS_2017-12-29
- AttN_Glare-Assessment_2017-10-10
- AttO_Visual Sims 2018-01-02
- AttP_Lease-Agreement-Redacted
- AttQ_Draft Common-Driveway-Agreement
- AttR_Vegetative-Maintenance-Plan_Revised-2018-01-02
- AttS_SHPO-Findings-Ltr
Response to Comments and Revisions 12-14-17
- Delaware River Solar 2243 Dryden Road site plan checklist- Planning Dept -12-2017
- Response to TG Miller 2017-12-13
- AttD_Ground-Disturbance-Notice_Revised-2017-12-14
- AttF_Project Summary Revised 2017-12-14
- AttH_Views Study Revised 2017-12-14part A
- AttH_Views Study Revised 2017-12-14 part B
- AttH_Views Study Revised 2017-12-14 part C
- AttH_Views Study Revised 2017-12-14 part D
- AttJ_FEAF-Complete_2017-12-14
- AttK_SWPPP-complete_2017-12-14
- AttL_Site-Plan-Set_Revised_2017-12-14
- AttO_Visual Sims 2017-12-14
- AttR_Vegetative Maintenance Plan Revised 2017-12-14
Complete Application 11-2017
- DRS Solar Review 2017-12-11
- 2017-11-20_Response-to-TGM
- AttA_General-Permit-Application-Form
- AttB_Owner-Acknowledgment-Ltr
- AttC_SUP-Worksheet_2017-11-30
- AttD_Ground-Disturbance-Notice REVISED
- AttD_Ground-Disturbance-Notice
- AttE_Agricultural-Data-Statement
- AttF_Project-Summary_2017-11-20
- AttG_Decomm-Plan-Agreement [Revised]
- AttH Views study part 1
- view study part 2
- view study part 3
- view study part 4
- AttI_Wetlands-Findings-Letter
- AttJ_ FEAF-Complete_2017-11-20
- AttK_SWPPP-complete_2017-10-31
- AttL_Site-Plan-Set
- AttM_Topo-Boundary-Survey_KMS
- AttN_Glare-Assessment_2017-10-10
- AttO_Visual Sims 2017-11-20
- AttP_Lease-Agreement-Redacted
- AttQ_Draft Common-Driveway-Agreement
- AttR_Vegetative-Maintenance-Plan
- AttS_SHPO-Findings-Ltr
TGM Completeness Review 11-9-17
Revised Documents 10-31-17
- AttK_Dryden-Road-SWPPP_81622-20
- AttH_Views-Study
- Transmittal
- AttJ_20171031-FEAF-Part1
- AttL_Site-Plan-Set
- AttF_Dryden-Road-Project-Memorandum
- AttM_Topo-Boundary-Survey_KMS
Supplement 10-20-17
- Att H supplement -Views Study
- AttJ supplement -20171020 FEAF Part 1 with Figs and Attachments
- AttL supplement -C150_81622-20_EROS
- AttL supplementC130_81622-20_SITE
- DRS Response to TG Miller Letter_171020
TGM Completeness Review 2017-10-18
- lead agency status Delaware River Solar Farm 8-18-17
- DEC lead agency response -Delaware River Solar LLC 2243 Dryden Rd
- TB-8-17-17 minutes
Application 10-6-17
- DRS-Chazen application cover letter
- AttA_General-Permit-Application-Form
- AttB_Owner-Acknowledgment
- AttC_SUP-Worksheet
- AttD_Ground-Disturbance
- AttE-03-2 Agricultural Data Statement
- AttF_Dryden-Road-Project-Memorandum- 1 of 2
- AttF_Dryden-Road-Project-Memorandum- 2 of 2
- AttG1_DRS-Decomm-Plan
- AttG2_DRS-Decomm-Agreement-Draft
- AttH_Views-Study
- AttI_Wetlands-Findings-Letter
- AttJ_20171006-FEAF-Part1
- AttK_Dryden-Road-SWPPP_81622-20
- AttL_Site-Plan-Set
- AttM_Kaatskill-Survey_2017-10-04
- AttN_Glare assessment
- AttO_Visual simulations
SUN8 (Distributed Sun) Community Solar Projects
(for site plan amendment regarding Interconnect on George Rd, click here)
- SWPPP Update 2150 Dryden Rd – LaBella – 9.23.20
- Decommissioning Agreement signed by Weiss and Pinney
- DTS II 2150 Dryden – Solar Decommissioning Plan
- Draft Resolution–approving decommissioning bond for 2150 Dryden Road
- DTS II 2150 Dryden – Vegetative Maintenance Plan
- SUN8 2150 Dryden Road SWPPP – SUP Record 2nd submisison
- SUN8 2150 Dryden Road SWPPP Reply to Comments_05.29.2018
- Ellis North Drawings 01-02-19
- Ellis South Drawings 01-02-19
- Ellis Tract Solar decommissioning agreement effective 12-19-18
- Ellis Tract Solar Decommissioning Plan signed 12.13.18
- Ellis Tract solar -Vegetative Maintenance Plan signed 12.13.18
- Ellis SWPPP – SUP Record 2nd submission
- Max-Span Ellis Calcs 20181003 (North_South Row Mids) – stamped
- gamechange – Dsun Ellis North 20181015 – stamped
- Max-Span Ellis Calcs 20181003 (All Row Ends, Mid Aisle) – stamped
- Max-Span Ellis Calcs 20181003 (Mid Row Mids) – stamped
- Max-Span Ellis South 20181003 (North_South Row Mids) – stamped
- Gamechnage – Ellis South 20181015 – stamped
- Max-Span Ellis South 20181003 (All Row Ends, Mid Aisle) – stamped
- Max-Span Ellis South 20181003 (Mid Row Mids) – stamped
- SUN8 Ellis Tract SUP Record Drawing
- SUN8 Ellis Tract SUP Record SWPPP
- SUN8 2150 Dryden Road SUP Record SWPPP
- SUN8 2150 Dryden Road SUP Record Drawing
- Draft Resolution–SUP Site Plan 2150 Dryden Rd
- Draft Resolution–SUP Site Plan Ellis Tract
- TG Miller Solar SUP Conditions 2017-08-14
- Planning Board recommendations on the SUN8 site plans
- 2150 Dryden Road SUP checklist with PD notes
- Ellis Tract SUP checklist with PD notes
- 2150 Dryden Road SPR checklist with PD notes
- Ellis Tract SPR checklist with PD notes
- legal ad- Sun8 SUP application 8-17-17
- Draft Ellis Tract solar Neg Dec
- Draft 2150 Dryden Road solar Neg Dec
- draft FEAF Part 2 and 3 for Ellis Tract solar
- 2150 Dryden Rd Errata-Modifications Tracking Sheet
- Ellis Tract Errata-Modifications Tracking Sheet
- existing conditions Ellis Tract – photos a-f
- existing conditions Ellis Tract – photos g-l
- existing conditions Ellis Tract – photos m-r
- Clarification on Compliance with PSC Regulation on Co-Location of Projects
- PSC order re Remote Net on Adjacent Sites
- Brookhaven Ruling
- draft FEAF Part 2 and 3 for 2150 Dryden Road solar
- TC 239 review -Ellis Tract Solar 07-06.17
- TC 239 review- 2150 Dryden Solar 07-06-17
Addendum to application
- clarification from Distributed Sun 7-7-17
- visual simulation from Turkey Hill Road
- 2150 Dryden Road SEQR LEAF Part1 – 170709 (most revisions highlighted with a cloud outline)
- Ellis Tract SEQR LEAF Part1 – 170709 (most revisions highlighted with a cloud outline)
- Ellis Solar Site- July 2017 drawings update
- 2150 Dryden Road July 2017 drawings update
- legal ad- Sun8 SUP 7-10-17
- 2150 Dryden Rd – SHPO 7-7-2017
- USACE ltr 06-23-17 NPR – Ellis Tract
- USACE ltr 06-23-17 NPR – Dryden Road
- Ellis and Dryden EAR Updates 06072017
- Dryden_EARUpdated_06172017
- Ellis_EARUpdated_06172017
- additional comments can be found in Town & Planning Board minutes here
- Comments May 17 – July 27, 2017 alphabetical by last name
- Comments June 13 – July 17, 2017 alphabetical by last name
- Comments May 19 – June 12, 2017 alphabetical by last name
- Response to TG Miller’s May 25 Letter
2150 Dryden Road Facilities Revised Application June 2017
(file names with suffix A or B signify materials revised since 4-12-17)
- 0. 2150 Dryden Road SUP Application Cover
- 1. 2150 Dryden Road SUP Application
- 2B. 2150 Dryden Road Site Plan Drawings – May 2017 (1)
- 3A. 2150 Dryden Road SEQR LEAF Part1 – May 2017
- 4. 2150 Dryden Road Phase 1 ESA
- 5. 2150 Dryden Road Aquatic Resources Report
- 6. 2150 Dryden Road Habitat Assessment
- 7. 2150 Dryden Road Boundary Map (ALTA) – Preliminary Approval
- 8. 2150 Dryden Road Agricultural Data Statement
- 9A. 2150 Dryden Road Visual Impact Statement – May 2017
- 10A. 2150 Dryden Road SWPPP – May 2017
- 11A. 2150 Dryden Road Ecological Assessment – May 2017
- 12A. 2150 Dryden Road NYSHPO No Impact Clearance Letter
Turkey Hill & Dodge Road (referred to as Ellis Tract) Facilities Revised Application June 2017
(file names with suffix A or B signify materials revised since 4-12-17)
- 0. Ellis Tract SUP Application Cover Letter
- 1. Ellis Tract Special Use Permit Application
- 2A. Ellis Tract Site Plan Drawings – May 2017
- 3A. Ellis Tract SEQR LEAF Part 1 – May 2017
- 4. -1 Ellis Tract Phase-1 Environmental Assessment – REPORT
- 4. -2 Ellis Tract Phase-1 Environmental Assessment TITLE REPORTING 1 of 4
- 4. -3 Ellis Tract Phase-1 Environmental Assessment – TITLE REPORTING 2 of 4
- 4. -4 Ellis Tract Phase-1 Environmental Assessment – TITLE REPORTING 3 of 4
- 4. -5 Ellis Tract Phase-1 Environmental Assessment – TITLE REPORTING 4 of 4
- 4. -6 Ellis Tract Phase-1 Environmental Site Assessment APPENDICES
- 5. Ellis Tract Aquatic Resources Report
- 6. Ellis Tract Habitat Assessment Report
- 7A. Ellis Tract Boundary Map (ALTA) – For Preliminary Approval (corrected ownership info 6-15-17)
- 8A. Ellis Tract SWPPP – Updated May 2017
- 9A. Ellis Tract Visual Impact Statement – May 2017
- 10A. Ellis Tract Ecological Assessment – May 2017
- 11B. Ellis Tract NYSHPO No Impact Clearance Letter
- TG Miller review-Solar Plants SEQR 2017-05-25 Revised
- SHPO Ellis Tract
- SHPO re Sun8 Dryden Rd
- DEC jurisdictional determination re ESA
- DEC jurisdictional determination re waterbodies
- TG Miller review -Solar Plants SEQR 2017-04-26
- TC 239 review -2150 Dryden Solar Special Use Permit Review 04-25-17
- TC 239 review -Ellis Solar Review 04-26-17
- Legal notice
- Press-Release-Meeting-on solar projects 4-14-17
- Letters May 3 – 22, 2017 alphabetical by last name
- Weldon Town Historian 4-20-17 solar & tower projects
- Comments May 13 – 18, 2017 alphabetical by last name
- Comments May 10-12, 2017 alphabetical by last name
- Comments May 5-9, 2017 alphabetical by last name
- Comments May 1-5, 2017 alphabetical by last name
- Letters April 21- 28, 2017 alphabetical by last name
- Comments April 13-30, 2017 alphabetical by last name
- Presentation at Neptune Fire Hall 4-26-17
- Dryden Solar_FAQ.Categ.flc.mm3
- Iroquoian Archaeology
2150 Dryden Road Facilities Revised Application 4-12-17
- 0. 2150 Dryden Road SUP Application Cover
- 1. 2150 Dryden Road SUP Application
- 2. 2150 Dryden Road Site Plan Drawings
- 3. 2150 Dryden Road LEAF
- 4. 2150 Dryden Road Phase 1 ESA
- 5. 2150 Dryden Road Aquatic Resources Report
- 6. 2150 Dryden Road Habitat Assessment
- 7. 2150 Dryden Road Boundary Map (ALTA) – Preliminary Approval
- 8. 2150 Dryden Road Agricultural Data Statement
- 9. 2150 Dryden Road Visual Impact Statement
- 10. 2150 Dryden Road SWPPP
Supplemental Materials
- 2150 Dryden Road Ecological Assessment
- 2150 Dryden Road- HabitatAssessment04102017 – Revision 1
- 2150 Dryden Road Tetra Tech Phase-1 Archeological Study Letter of Recommendation to NYSHPO
- SUN8 Responses to TG Miller’s Questions for 2150 Dryden Road on April 26
- SWPPP Narrative 2150 Dryden Road rev 4-25
Turkey Hill & Dodge Road (referred to as Ellis Tract) Facilities Revised Application 4-12-17
- 0. Ellis Tract SUP Application Cover Letter
- 1. Ellis Tract Special Use Permit Application
- 2. Ellis Tract Site Plan Drawings
- 3. Ellis Tract LEAF
- 4. Ellis Tract Phase-1 Environmental Assessment – REPORT
- 4a Ellis Tract Phase-1 Environmental Assessment – TITLE REPORTING 1 of 4
- 4b Ellis Tract Phase-1 Environmental Assessment – TITLE REPORTING 2 of 4
- 4c Ellis Tract Phase-1 Environmental Assessment – TITLE REPORTING 3 of 4
- 4d Ellis Tract Phase-1 Environmental Assessment – TITLE REPORTING 4 of 4
- 4. Ellis Tract Phase-1 Environmental Site Assessment APPENDICES
- 5. Ellis Tract Aquatic Resources Report
- 6. Ellis Tract Habitat Assessment Report
- 7. Ellis Tract Boundary Map (ALTA) – For Preliminary Approval
- 8. Ellis Tract SWPPP
- 9. Ellis Tract Visual Impact Assessment
Supplemental Materials
- Ellis Tract Ecological Assessment
- Ellis Tract – HabitatAssessment04112017 – Revision 1
- Ellis Tract Line of Sight Turkey Hill
- Ellis Tract SGHAT IT Airport flight path
- Ellis Tract SWPPP Narrative rev 4-2511. 2150 Dryden Road Ecological Assessment
PHASE 1 Materials – Original Application – 2-22-17
- Comments for April 1-12, 2017 alphabetical by last name
- Comments March 1-31, 2017 alphabetical by last name
- Notice of Hearing
- Solar Project Narrative
- Minutes from Town Board Meeting 3-16
- Original 2150 Dryden Road-Application-2-22-17
- sun8 2150 Dryden Road SWPPP Narrative final
- 2150 Dryden Road 02-17-2017 Site Plans
- 2150 Dryden Road LEAF part 1 signed
- 2150 Dryden_38.-1-3.1_NRCS Soils Map
- General-Application-Ellis
- sun8 Ellis Tract SWPPP Narrative
- Cornell Solar Sites 2-22-2017 Ellis site plans
- Ellis Tract LEAF part 1 Env Mapper signed
- Ellis North_Soil_Report
- Ellis South Soil_Report
- Cornell Letter Re Solar Project Sites
____________________________________________________________________________________________________
SUP Approvals
- 1847 Hanshaw Rd – Bailey Contractor Yard- Approved 7-16-20
- 16 Freeville Road – amendment for I-Deal Self Storage – Approved 11-21-19
- 51 Hall Road – Delong Auto and Heavy Equipment Repair – Approved 11-21-19
- 1610 Dryden Road – Second Home – kennel – Approved 11-21-19
- 2141 Dryden Road – Medical Office Entrance Sign – Approved 7-18-19
- 117 North St. – Donlick Auto Sales – Approved 12-20-18
- 450 Cortland Rd. – 2Pros Contractor Yard – Approved 12-20-18
- 1610 Dryden Road – Veterinary Office – Approved 10-18-18
- 1384 Dryden Road – Brew 22 Coffee & Espresso – Approved 9-20-18
- 1650 Hanshaw Rd. – Professional office – Approved 8-16-18
- 63 & 129 Hammond Hill Road-Camp Earth Connections – Approved 4-27-18
- 225 North Road – Hair Salon business – Approved 4-12-18
- Dryden Baptist Church- 138 Virgil Road- SUP-Approved 7-20-17
- Verizon Cell Tower 2150 Dryden Road – Approved 4-20-17
- 16 Freeville Road – Self-Storage Business – Approved 10-20-16
- 902 Dryden Road – Townhomes – Approved 3-17-16
- 1401 Dryden Road – Self-Storage Business – Approved 3-17-16