In the spring of 2019, the Town Board hired Hunt Engineering to conduct a feasibility study for a Dryden owned Municipal Broadband network. At the November 21, 2019, Dryden Town Board Meeting, Hunt Engineering gave a presentation about the study. Both the slides that accompanied the presentation and the final copy of the study are available at the links below.

Read the report here: Dryden Municipal FTTH Report

Review the Presentation here: Dryden (T) FTTH Presentation